From March 2016 to December 2019 Austin Master Services conducted well tests on-site by company-trained personnel. In September 2021, Civil & Environmental Consultants, Inc. (CEC) of Columbus, Ohio was hired to perform semi-annual sampling.
The groundwater monitoring is conducted using a network of four monitoring wells situated around the Martins Ferry facility. Austin Master Services installed three of the wells in 2015 while the fourth well was installed by the previous facility owner. The wells have bottom depths of 33.6 to 37.3 feet below ground surface.
Links to the most current reports are available to the right.